Vredo Sleepslang Combinatie

Drophose combination with 5000L buffer tank . Slewing jib can unforced putting on headland can be easily rotated while the valve on the injector can be closed . There is also possibility to hang a standard reel in the front linkage for 800meter hose .

Read: 245
  • Site Comments

Write a comment

Ridge Removal the D11 Way..

The D11 works fast requiring only one pass to remove the

0 2 20 November 2017